How We Build Press Brakes
Eleven documented steps. No shortcuts. Paint first, assemble second.
The 11 Steps
1. Design
Every machine is fully modeled in SolidWorks 3D. HyperMesh/ANSYS stress analysis before any steel is cut.
2. Material
Steel plates with batch labels and material certificates. FEA before cutting — we don’t copy last year’s design.
3. Rough machining
Large components rough-machined first — then final finish, so the bed doesn’t shift after delivery.
4. Gantry finish
The entire bed is milled in one pass on our GMF8042 gantry (±0.02mm flatness). No section joints, no accumulated error.
5. Laser cutting
CNC laser cutting with clean edges — hole positions calculated, not marked by hand.
6. Welding + stress relief
Welding by certified welders, then thermal stress relief at 550–600°C so the machine doesn’t warp over time.
7. Paint, then assemble
We paint before assembly — not after. No post-paint grinding, no paint dust in precision surfaces.
8. Assembly
Hydraulic installation and controller calibration in a bright, clean assembly bay.
9. Testing
7-point inspection, 24-hour continuous no-load run, then real test bending. Every safety function verified.
10. Packaging
VCI wrapping, crate, container loading — and we send you a photo of the container interior before sealing.
11. Customer
Delivered, installed, and supported — with your machine’s complete digital engineering package for life.
What We Do — and Why Most Don’t
| What we do | Why most don’t |
|---|---|
| FEA (finite element analysis) before cutting steel | Copy last year’s design |
| Machine bed in one pass on GMF8042 gantry (±0.02mm) | Machine in sections → accumulated error |
| Rough machining before final finish | Skip it → bed shifts after delivery |
| Thermal stress relief after welding | Skip it → machine warps over time |
| Paint first, then assemble | Assemble first → paint dust degrades precision |
| 7-point inspection + 24h run + test bend | 30-minute ‘turn it on’ test |
| Full 3D model + digital parts archive | Hand-drawn or partial CAD → slow, inaccurate parts |
| Photo of container interior before sealing | ‘It shipped’ — hope for the best |
Come See How We Build.
Get a quote, delivery time, and honest technical advice — straight from the factory. 1-hour response during working hours (GMT+8, Mon–Fri).